Bond Exoneration/Tract Acceptance
The process for bond exoneration/tract acceptance is needed when construction phases are released for sale and occupancy for an entire tract. Documents can be submitted proactively to reduce lag time. However, construction must be complete for the entire tract to finalize the process. To begin the process please see instructions below:
Step1 | Ensure the SMWD inspector has:
|
Step2 | Send the following documents listed below as digital copies to engcounter@smwd.com. Please do not include items that are private, temporary, or removed.
View Cost of Construction Example
|
Step3 | Upon review and necessary revisions, please mail the following documents to the District Headquarters:
Please note, all documents must be final copies with signatures. |
Step4 | Once final copies and drawings have been approved the following will be requested
|
Step5 | After mylar record drawings have been approved, a package will be prepared for consent at the soonest possible Engineering/Operations Committee Meeting (EOC). Following approval at the EOC, the package will proceed to the subsequent Board Meeting. Within 2 weeks of Board approval, a Bond Exoneration/Tract Acceptance Letter will be issued. |