How do I submit Irrigation Plans for Recycled Water?

All on-site irrigation systems that use or plan to use recycled water must be reviewed and approved by the District’s Chief Engineer to ensure the project complies with the District’s Technical Requirements for Recycled Water Service.  Please consult the recycled water irrigation plan review and approval flowchart.  A review and inspection fee of 4% is required.  The following documents need to be submitted:

  • Irrigation Plans
  • Recycled Water Use (RWU) Exhibit that conforms to District's RWU Design Guide
  • Estimated cost of irrigation system
  • District approved Civil Engineering sheet that provides location of recycled water point of connection(s).